REI

×

Error message

  • Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home4/sddeacon/public_html/includes/common.inc).
  • Deprecated function: The each() function is deprecated. This message will be suppressed on further calls in _menu_load_objects() (line 571 of /home4/sddeacon/public_html/includes/menu.inc).

Multiple Locations, West Coast

REI

We are pleased to have completed multiple projects for REI including new construction, remodel and tenant improvements. The work took place in three states, totaling nearly $5 million in construction value and involving over 185,000 sf of space. In each project, we installed steel stairs and guardrails and specialized finishes and modified storefronts. In Sacramento, we replaced all of the single-lamp light fixtures with eight-lamp fixtures, managed by a sophisticated control system that adjusts the light level based on the amount of natural lighting coming from the 20 new skylights. All of the remodel work took place while the stores remained open for business, either at night or during the day, but with no customer inconvenience allowed.

Owner
Recreational Equipment, Inc.
Architect
MulvannyG2 Architecture
REI
REI