Nissan of the Eastside
Error message
- Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home4/sddeacon/public_html/includes/common.inc).
- Deprecated function: The each() function is deprecated. This message will be suppressed on further calls in _menu_load_objects() (line 571 of /home4/sddeacon/public_html/includes/menu.inc).
Bellevue, Washington
Completed in a record six months despite stormy winter weather and a rigorous inspection schedule, the scope of work for construction of this new car dealership consisted of a 15,600 sf two story office building comprised of concrete, steel and curtain wall with ACM exterior panels with vertical and horizontal siding. The interior finishes included ceramic tile, carpet flooring, and both wood paneling and painted walls. Aluminum windows and storefronts completed the building structure. Additionally, we also built a 56,000 sf two store concrete parking garage utilizing post-tension construction.
Testimonial
Deacon Corp. delivered an extremely beautiful finished product and did it on schedule despite the obstacles encountered along the way.