Porterville, California

Chilled Water Replacement Porterville Developmental Center

This was the design and installation of a new 2,400 ton capacity chilled water cooling system for an existing state-run center which provides care and service to the developmentally disabled. The work included installation of new chillers and cooling towers, electrical switchgear and transformers and underground piping connections to 34 buildings. Other elements included the build out of a new computerized control system for the entire campus.

Owner
State of California