USF Reddaway Freight Transfer Station
×
Error message
- Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home4/sddeacon/public_html/includes/common.inc).
- Deprecated function: The each() function is deprecated. This message will be suppressed on further calls in _menu_load_objects() (line 571 of /home4/sddeacon/public_html/includes/menu.inc).
Kent, Washington
This 42,000 sf expansion of an existing freight transfer station consisted of a 15,000 sf raised loading dock with 40 doors, a forklift ramp, and a pneumatic tube delivery system connecting the dock to the front office. The addition was painted to match the original building. New site lighting, extensive concrete aprons and asphalt / striping work to finish the site. Our biggest challenge was ensuring that the owner continued normal business operations while we executed our own tight construction schedule, a feat made possible through ongoing communication with the onsite Operations Manager and the owner's representative in Ohio.
Owner
YRC Enterprises
Architect
Cornerstone Architects