University Village at Albany - Step 2
Error message
- Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home4/sddeacon/public_html/includes/common.inc).
- Deprecated function: The each() function is deprecated. This message will be suppressed on further calls in _menu_load_objects() (line 571 of /home4/sddeacon/public_html/includes/menu.inc).
Albany, California
This schedule for this four and a half year project began with the demolition of existing student family housing with extensive removal of hazardous materials. A total of 558 new two- and three-bedroom student housing units, associated laundry rooms and mailrooms were distributed through 29 three-story buildings. The 22 acres of sitework included complete design and construction of infrastructure, pavement and landscape. A special consideration was the requirement that 100% of storm water runoff be filtered before emission into adjacent creeks. This was accomplished with extensive use of planted bioswales.
Testimonial
I was a member of the design-build teams that created two highly successful phases of University Village at Albany. I witnessed first hand how your team effectively negotiated the complex process.