One Carillon Point

×

Error message

  • Deprecated function: implode(): Passing glue string after array is deprecated. Swap the parameters in drupal_get_feeds() (line 394 of /home4/sddeacon/public_html/includes/common.inc).
  • Deprecated function: The each() function is deprecated. This message will be suppressed on further calls in _menu_load_objects() (line 571 of /home4/sddeacon/public_html/includes/menu.inc).

Kirkland, Washington

One Carillon Point

This project consisted of the removal of 9,400 sf of concrete patio topping slab and membrane. A Triflex membrane system was installed on the structural slab and into the gutters. Concrete pavers with a pedestal system were installed as the new patio surface. Other work included painting the steel railings and applying stucco on the west and south sides. An iron-wood (ipe) trellis was installed along the 700-foot long railing.

Owner
One Carillon Point Association
Architect
Olympic Associates